| Solar inverter | Manufacturer, model, rating, age and warranty | Determines compatibility and whether replacement is sensible. |
| Solar array | Panel model, number, strings and original design | A hybrid conversion must remain electrically suitable. |
| FIT or SEG | Tariff documents, licensee and export arrangement | Storage may affect metering or the evidence required for payments. |
| Grid connection | G83/G98/G99 paperwork and any export limitation | The DNO assesses the combined inverter arrangement. |
| Electrical supply | Main fuse, phases, meter and consumer-unit condition | Charging power and installation method depend on the supply. |
| Equipment location | Dimensions, access, temperature, clearances and route | A technically suitable battery still needs a compliant position. |
| Electricity use | Annual total and, ideally, half-hourly pattern | Capacity should follow the energy that can actually be shifted. |
| Objective | Solar capture, tariff charging, backup or all three | Different objectives produce different designs. |